![background image](http://html1.mh-extra.com/html/omron/cx-process-monitor-plus-2/cx-process-monitor-plus-2_operation-manual_744195036.webp)
21
CX-Process Monitor Plus
Section 1-1
1-1-8
Files Created Using CX-Process Monitor Plus
The following data can be created using the CX-Process Monitor Plus
1-1-9
Version Upgrade
The CX-Process Monitor Plus has been upgraded from version 1.0 to version
2.0. The following table lists the contents of the version upgrade.
Data type
Contents
Graphic screen data
(filename extension: grf)
Graphic screen data, created for each screen.
Object data
(filename extension: itm)
Grouped object data (functional objects, figures,
images), created when a group file is saved. (Does
not include jump elements or FP switch elements.)
Item
Previous (version 1.0)
New (version 2.0)
Startup method
There were two modes: Engineer Mode
and Operator Mode.
•
Setup (Engineer Mode)
Start
Button
→
Engineer
Button
→
Setup
Button
→
Password input
•
Operation
Start
Button
→
Operator
Button
Startup has been divided into setup and
operation.
•
Setup
Setup
Button
→
Password input
→
Run
Button
•
Operation
Run
Button
Monitor display
Maximum size: XGA 1,024
×
768
Individual monitor screens can be dis-
played on the entire desktop.
Segment Program 2 Screen
No
Yes
•
PV trends for values set in the Seg-
ment Program 2 Monitor Screen are
displayed.
•
Collection cycle: 1, 10, or 60 s
Maximum retention period:
3, 30, or 180 days, past data automati-
cally saved, or CSV data automatically
saved
•
Segments can be set in table format on
the Segment Program 2 Edit Screen.
•
Past data can be read.
Batch Trend Screens
No
Yes
•
Trend function that can start or end col-
lecting with tag data (contact or ana-
log) as a trigger.
•
Collection cycle: 1 min or 1 s
Maximum retention period: 10 days, 4
hours, past data automatically saved,
or CSV data automatically saved
•
Data can be overlapped with past data.
Trend
Screens
Data collection cycle and
maximum retention period
for realtime trends
Collection cycle: 10 s
Maximum retention period: 12 hours
Collection cycle: 1, 2, 5, 10, or 30 s
Maximum retention period: 10, 20, 50,
100, or 300 hours
Data collection cycle and
maximum retention period
for historical trends
Collection cycle: 1 min
Maximum retention period: 10 days
Collection cycle: 1, 5, 10, 30, or 60 min
Maximum retention period: 30, 150, 300,
900, or 1,800 days
Graphic
Screens
Graphic screen saving and
reading
Yes (No filename extension)
Yes (Filename extension: GRF)
Summary of Contents for CX-Process Monitor Plus 2
Page 1: ...CX Process Monitor Plus Ver 2 Cat No W428 E1 02 SYSMAC WS02 LCMC1 EV2 OPERATION MANUAL...
Page 2: ...WS02 LCMC1 EV2 CX Process Monitor Plus Ver 2 Operation Manual Revised January 2007...
Page 3: ...iv...
Page 5: ...vi...
Page 9: ...x...
Page 15: ...xvi Application Precautions 4...
Page 41: ...26 Basic Operating Procedure Section 1 2...
Page 243: ...228 Checking Configurations Section 5 7...
Page 267: ...252 Reading Writing Function Block ITEMs Appendix A...
Page 269: ...254 Differences between Trend Screens and Batch Trend Screens Appendix B...