![background image](http://html1.mh-extra.com/html/omron/cx-process-monitor-plus-2/cx-process-monitor-plus-2_operation-manual_744195040.webp)
25
Basic Operating Procedure
Section 1-2
c.
In the Setup Dialog Box, click the
Run
Button (to start the monitoring
process for the configured screen, and to start communications).
d.
Select the screens using the Overview Screen, and check that each
function is operating normally.
5.
Start the Monitor Operation to monitor the Loop Control Unit/Board. (Refer
to
Section SECTION 4 Monitor Screen Functions and Operations
for de-
tails.)
Perform the following operation.
a.
Click the
Run
Button in the Main Window.
b.
Click the screens using the Overview Screen.
Summary of Contents for CX-Process Monitor Plus 2
Page 1: ...CX Process Monitor Plus Ver 2 Cat No W428 E1 02 SYSMAC WS02 LCMC1 EV2 OPERATION MANUAL...
Page 2: ...WS02 LCMC1 EV2 CX Process Monitor Plus Ver 2 Operation Manual Revised January 2007...
Page 3: ...iv...
Page 5: ...vi...
Page 9: ...x...
Page 15: ...xvi Application Precautions 4...
Page 41: ...26 Basic Operating Procedure Section 1 2...
Page 243: ...228 Checking Configurations Section 5 7...
Page 267: ...252 Reading Writing Function Block ITEMs Appendix A...
Page 269: ...254 Differences between Trend Screens and Batch Trend Screens Appendix B...