Fig. 23: Identifying PCV Valve Heater Connector Terminal
Courtesy of MAZDA MOTORS CORP.
CIRCUIT OPEN/SHORT INSPECTION
1. Disconnect the PCM connector.
2. Inspect the following wiring harnesses for open or short circuit (continuity check).
Fig. 24: Identifying PCV Valve Heater Control Wiring Harness Side Connector
Courtesy of MAZDA MOTORS CORP.
Fig. 25: Identifying Fuse Box (Main Relay No.1)
Courtesy of MAZDA MOTORS CORP.
2008 Mazda CX-9 Grand Touring
2008 ENGINE PERFORMANCE Emission System (MZI-3.7) - Mazda CX-9
Microsoft
Sunday, November 15, 2009 10:04:04 AM
Page 18
© 2005 Mitchell Repair Information Company, LLC.