Courtesy of MAZDA MOTORS CORP.
PROPELLER SHAFT INSPECTION
1. Measure the propeller shaft center runout using the dial gauge.
z
If it exceeds the maximum specification, replace the propeller shaft as a single component.
Propeller shaft maximum runout 0.8 mm {0.031 in}
Fig. 9: Measuring Propeller Shaft Center Runout
Courtesy of MAZDA MOTORS CORP.
2. Inspect the play and rotation of the joint by turning the universal joint in the directions shown by the
arrows.
z
If it is not within the specification, replace the propeller shaft.
Propeller shaft starting torque 0.29-1.47 N.m {3.0-14.9 kgf.cm, 2.6-13.0 in.lbf}
Fig. 10: Inspecting Play And Rotation Of Joint
Courtesy of MAZDA MOTORS CORP.
2008 Mazda CX-9 Grand Touring
2008 DRIVELINE/AXLE Propeller Shaft - Mazda CX-9
Microsoft
Sunday, November 15, 2009 9:53:04 AM
Page 6
© 2005 Mitchell Repair Information Company, LLC.