540 N9030B PXA Signal Analyzer Service Guide
Assembly Replacement Procedures
Front Frame Assembly
Figure 16-99
Front Panel Cable
Replacement
1.
Reattach the ribbon cable W1. Ensure the locking tabs are engaged.
2.
. Carefully position the Front Frame Assembly onto
the chassis. Ensure no cables are crushed. Replace the eight screws
(2)
(
), four on each side of the chassis. Torque to 9 inch pounds.
3.
If option EXM, External Mixing, is installed attach semi-rigid LO/IF cable.
Torque to 10 inch-pounds.
4.
Replace the outer case. Refer to the
replacement
procedure.
Summary of Contents for N9030B
Page 4: ...4 ...
Page 14: ...14 N9030B PXA Signal Analyzer Service Guide Contents ...
Page 342: ...342 N9030B PXA Signal Analyzer Service Guide Hardware Options Option RTS Streaming ...
Page 344: ...344 N9030B PXA Signal Analyzer Service Guide Block Diagrams Block Diagrams Block Diagrams ...
Page 572: ...572 N9030B PXA Signal Analyzer Service Guide Post Repair Procedures Post Repair Procedures ...
Page 612: ...612 N9030B PXA Signal Analyzer Service Guide Instrument Software Software Updates ...