552 N9030B PXA Signal Analyzer Service Guide
Post-Repair Procedures
Post-Repair Procedures
Post-Repair Procedures
lists the adjustments and performance verification tests needed
after an assembly replacement.
After an assembly is replaced, find the assembly that has been replaced in the
left-hand column, and then perform the recommended adjustment and/or
performance verification test. Making the recommended adjustments and/or
performance verification tests doesn’t guarantee all published specifications
are being met. Only a full instrument calibration will do this.
The following procedures are also included in the
.
—
“Calibration Data Backup and Restore”
—
—
“End User License Agreement (EULA) Acceptance”
—
—
“Programming Model and Serial Numbers”
Refer to the analyzer user’s guide for information on instrument warm-up
before performing any of the procedures listed in this chapter.
Summary of Contents for N9030B
Page 4: ...4 ...
Page 14: ...14 N9030B PXA Signal Analyzer Service Guide Contents ...
Page 342: ...342 N9030B PXA Signal Analyzer Service Guide Hardware Options Option RTS Streaming ...
Page 344: ...344 N9030B PXA Signal Analyzer Service Guide Block Diagrams Block Diagrams Block Diagrams ...
Page 572: ...572 N9030B PXA Signal Analyzer Service Guide Post Repair Procedures Post Repair Procedures ...
Page 612: ...612 N9030B PXA Signal Analyzer Service Guide Instrument Software Software Updates ...