N9030B PXA Signal Analyzer Service Guide 465
Assembly Replacement Procedures
RF Area (Options 503, 508, 513, 526)
8.
Refer to
. Install the bracket
(1)
to the switch
(2)
using three
screws
(3)
). Assure the number 3 on the switch is positioned
as shown. Torque screws to 6 inch-lbs. Install the ribbon cable
(4)
into the
switch connector header.
Figure 16-33
Bracket Mount to Switch
Summary of Contents for N9030B
Page 4: ...4 ...
Page 14: ...14 N9030B PXA Signal Analyzer Service Guide Contents ...
Page 342: ...342 N9030B PXA Signal Analyzer Service Guide Hardware Options Option RTS Streaming ...
Page 344: ...344 N9030B PXA Signal Analyzer Service Guide Block Diagrams Block Diagrams Block Diagrams ...
Page 572: ...572 N9030B PXA Signal Analyzer Service Guide Post Repair Procedures Post Repair Procedures ...
Page 612: ...612 N9030B PXA Signal Analyzer Service Guide Instrument Software Software Updates ...