N9030B PXA Signal Analyzer Service Guide 437
Assembly Replacement Procedures
Top Brace and Power Supply Bracket
Figure 16-5
Wire Hold Downs
Replacement
1.
. To replace the top brace or the power supply
bracket, place them into the correct position and attach the screws
referred to in the removal process. Reinstall wire hold down 1. Torque to
9 inch-pounds.
Summary of Contents for N9030B
Page 4: ...4 ...
Page 14: ...14 N9030B PXA Signal Analyzer Service Guide Contents ...
Page 342: ...342 N9030B PXA Signal Analyzer Service Guide Hardware Options Option RTS Streaming ...
Page 344: ...344 N9030B PXA Signal Analyzer Service Guide Block Diagrams Block Diagrams Block Diagrams ...
Page 572: ...572 N9030B PXA Signal Analyzer Service Guide Post Repair Procedures Post Repair Procedures ...
Page 612: ...612 N9030B PXA Signal Analyzer Service Guide Instrument Software Software Updates ...