HTX30 Product Manual
Commissioning
5-3
Before starting
Before starting:
This part of the commissioning should be done before the vessel is in the water.
Make sure that the control system power can be turned on and off.
If applicable, find the engine RPM sensors, and make sure that they can be disconnected.
If applicable, find the gearbox override or manual override controls.
Make sure all safety systems on the vessel are working.
Have the necessary schematics available.
Ensure that the waterjet has been installed and set up as described in the waterjet product manual.
Connect the laptop to a station control panel via the USB port located under the bung on the front of the
SCP.
Start the Support Tool.
If this is the first time a commissioning has been done on this laptop, a driver installation dialogue will
appear. Follow the on-screen instructions.
Place the laptop in a dry, safe place, away from severe vibration.
When the laptop is connected to the SCP,
Connected to a new system
is displayed.
Click "Click here to start a new commissioning"
to
begin commissioning.
Summary of Contents for HTX30
Page 1: ...HTX30 HTX30 Product Manual R0A5 blue ARROW...
Page 8: ...1 vi...
Page 20: ......
Page 26: ......
Page 178: ......
Page 181: ...Notes...