Chapter
5
Maintenance
5-48
Confidential
Copying Prohibited
●
Electrical Inspection
Item Inspection
Item
Procedure
Criteria
Power
1 Power
supply
Turn the power ON and check the
screen.
Display turns ON at power ON.
1 Display
test
Verify if any abnormality or flickering.
No abnormality or flickering
should be found. Waveform
should be properly displayed.
Displ
ay
2 Display
test
Check according to “5.3.15 Testing the
Display”.
All dots should be displayed in
correct colors.
Touch
Pane
l
1
Touch panel test
Check according to “5.3.17 Testing the
Touch Panel”.
The touched point should
properly respond.
Contro
l Pane
l
1
Fixed key test
Check according to “5.3.14 Testing
Operation Panel Fixed Keys”.
Symbol corresponding to the
pressed key should highlight.
Soun
d
1 Sound
test
Check according to “5.3.16 Testing
Sound and Tone”.
Proper sound or tone should
generate.
1 Print
Check if waveforms are properly
printed.
Waveform should be properly
printed
Built-in Recorder
2
Built-in recorder test
Check according to “5.3.2 Testing
Built-in Thermal Array Recorder”.
No zigzag running, irregular
recording and missed dots.
Recording speed should be
within 5/10/12.5/25/50mm
±
3%.
I/O 1
I/O
test
Check according to “5.3.3 Complete
I/O Test”.
No error should be found after
performing 100 tests.
1 Zero
point
Check the pressure value when no
connection is made to the air
connectors.
Should be within 0
±
1mmHg.
2 Pressure
accuracy
Check according to “5.3.12 Confirming
Pressure Accuracy”.
Should be within
±
3mmHg
.
3 BP
test
Measure the BP of the limbs.
Should be proper value.
4 Maximum
pressure
Should be 320
±
10mmHg.
5
Inflation time
Should be 9 sec. or less.
6
Air leakage
Should be 6mmHg/min or less.
7
Quick exhaust
Should be 10 sec. or less.
8
100% open
Should be 20 to 60mmHg/sec.
9 75%
open
Should be 10mmHg/sec or
above.
BP
10 Time
limit
Check according to “5.3.10 Testing
Pump Unit”.
Should be 130
±
10 sec.
Should be 8
±
1 sec. at high
speed.
Summary of Contents for VaSera VS-1500
Page 12: ...Confidential Copying Prohibited x ...
Page 18: ...0 Chapter 1 Features 1 6 Confidential Copying Prohibited ...
Page 32: ...Chapter 4 Names of Parts of Equipment 4 6 Confidential Copying Prohibited ...
Page 42: ...Chapter 5 Maintenance 5 10 Confidential Copying Prohibited Diagonal Line Stripe ...
Page 178: ...Chapter 10 Part Location Diagram and Checkpoints Confidential Copying Prohibited 10 3 ...
Page 180: ...Chapter 10 Part Location Diagram and Checkpoints Confidential Copying Prohibited 10 5 ...
Page 191: ...Chapter 10 Part Location Diagram and Checkpoints 10 16 Confidential Copying Prohibited ...
Page 207: ...Chapter 11 Spare Parts List 11 16 Confidential Copying Prohibited ...