
Chapter 8
Disassembly and Assembly
(8) Screw down the upper ECG amplifier cover SU.
Secure locations (2) marked
○
using:
W SEMS (L) M3 × 16
Secure location (1) marked
○
using:
P tight pan head WH 3 ×10
Make sure that D-Sub
connector lock fittings protrude
from locations marked
□
.
Upper ECG amplifier cover SU
First fit cover at location marked
○
.
(9) Attach the center shield plate and connect the BP cable.
Secure locations (5) marked
○
using:
W SEMS (L) M3 × 8
Connector locations (4)
Connect matching cable color with silk printing
Green (G), Black (B), Yellow (Y), Red (R)
* The yellow cable must be routed over the
green cable so that the latter does not come in
contact with the metal edge of the plate.
Attach and secure leftward from screw
locations
Tie base BS-20
Binder SKB-1M
8-14
Confidential
Copying Prohibited
Summary of Contents for VaSera VS-1500
Page 12: ...Confidential Copying Prohibited x ...
Page 18: ...0 Chapter 1 Features 1 6 Confidential Copying Prohibited ...
Page 32: ...Chapter 4 Names of Parts of Equipment 4 6 Confidential Copying Prohibited ...
Page 42: ...Chapter 5 Maintenance 5 10 Confidential Copying Prohibited Diagonal Line Stripe ...
Page 178: ...Chapter 10 Part Location Diagram and Checkpoints Confidential Copying Prohibited 10 3 ...
Page 180: ...Chapter 10 Part Location Diagram and Checkpoints Confidential Copying Prohibited 10 5 ...
Page 191: ...Chapter 10 Part Location Diagram and Checkpoints 10 16 Confidential Copying Prohibited ...
Page 207: ...Chapter 11 Spare Parts List 11 16 Confidential Copying Prohibited ...