8.
Check the settings information in the Start Copying Files page, and then click Next.
9.
Copying of the program is started.
The following installation wizard page is displayed. The upgrade process is completed. Click Finish.
10.
Eject the DVD-ROM.
9.3.2.3 Tasks to Be Performed After Upgrade (Primary Node)
If multiple Managed Server transactions exist, use this procedure in each primary node for Managed Server transaction.
- 172 -