APPENDIX
App. - 20
App. 4.9 Check list for user documentation
MR-J4 installation checklist for manufacturer/installer
The following items must be satisfied by the initial test operation at least. The manufacturer/installer must
be responsible for checking the standards in the items.
Maintain and keep this checklist with related documents of machines to use this for periodic inspection.
1. Is it based on directive/standard applied to the machine?
Yes [ ], No [ ]
2. Is directive/standard contained in Declaration of Conformity (DoC)?
Yes [ ], No [ ]
3. Does the protection instrument conform to the category required?
Yes [ ], No [ ]
4. Are electric shock protective measures (protective class) effective?
Yes [ ], No [ ]
5. Is the STO function checked (test of all the shut-off wiring)?
Yes [ ], No [ ]
Checking the items will not be instead of the first test operation or periodic inspection by professional
engineers.
Содержание MR-J4-100B(-RJ)
Страница 17: ...8 MEMO ...
Страница 143: ...4 STARTUP 4 20 MEMO ...
Страница 199: ...5 PARAMETERS 5 56 MEMO ...
Страница 227: ...6 NORMAL GAIN ADJUSTMENT 6 28 MEMO ...
Страница 281: ...8 TROUBLESHOOTING 8 16 MEMO ...
Страница 303: ...9 DIMENSIONS 9 22 MEMO ...
Страница 319: ...10 CHARACTERISTICS 10 16 MEMO ...
Страница 429: ...11 OPTIONS AND PERIPHERAL EQUIPMENT 11 110 MEMO ...
Страница 435: ...12 ABSOLUTE POSITION DETECTION SYSTEM 12 6 MEMO ...
Страница 483: ...14 USING A LINEAR SERVO MOTOR 14 34 MEMO ...
Страница 531: ...16 FULLY CLOSED LOOP SYSTEM 16 26 MEMO ...
Страница 613: ...17 APPLICATION OF FUNCTIONS 17 82 MEMO ...
Страница 653: ...APPENDIX App 40 This certificate is valid until 2017 02 28 After March 2017 use certificate shown on the previous page ...
Страница 654: ...APPENDIX App 41 ...