902
APPX
Appendix 9 Processing Time
I/O refresh processing time
The I/O refresh processing time for module mounted on main base unit and extension base unit can be calculated by the
following formula.
I/O refresh processing time [
s] = ((Number of input refresh points
*1
KM1) + (Number of unit having number of input points
KM2) + KM3
*3
) + ((Number of output refresh points
*2
KM4) + (Number of unit having number of output points
KM5) +
KM6
*3
)
*1 The value indicates the numeric value that is obtained through dividing the number of input points by 16.
*2 The value indicates the numeric value that is obtained through dividing the number of output points by 16.
*3 When the number of I/O points is 0, this value is handled as 0.
Condition
Constant value
MELSEC iQ-R series module
Main base unit
Input
KM1
0.04
KM2
0.56
KM3
11.2
Output
KM4
0.02
KM5
0.94
KM6
6.30
Extension base unit
Input
KM1
0.04
KM2
0.56
KM3
11.2
Output
KM4
0.02
KM5
0.94
KM6
6.30
Q series module
RQ extension base unit
Input
KM1
1.15
KM2
1.33
KM3
24.0
Output
KM4
0.03
KM5
1.20
KM6
6.21
Q series extension base unit
Input
KM1
1.85
KM2
1.98
KM3
39.4
Output
KM4
0.02
KM5
1.29
KM6
6.01
Содержание MELSEC iQ-R-R00CPU
Страница 2: ......
Страница 151: ...9 MONITOR FUNCTION 9 1 Real Time Monitor Function 149 9 MEMO ...
Страница 323: ...18 SEQUENCE SCAN SYNCHRONIZATION SAMPLING FUNCTION 321 18 MEMO ...
Страница 330: ...328 20 ROUTING SETTING 20 3 Precautions MEMO ...
Страница 423: ...26 BASIC CONCEPT 26 8 State Transition of the Redundant System 421 26 MEMO ...
Страница 524: ...522 30 MAINTENANCE AND INSPECTION FOR A REDUNDANT SYSTEM 30 1 Module Replacement in the Redundant System MEMO ...
Страница 1009: ...APPX Appendix 14 List of Available SQL Commands for CPU Module Database Access Function 1007 A MEMO ...
Страница 1014: ...1012 APPX Appendix 15 Added and Enhanced Functions MEMO ...
Страница 1027: ......