![Mitsubishi Electric MELSEC iQ-R-R00CPU Скачать руководство пользователя страница 808](http://html.mh-extra.com/html/mitsubishi-electric/melsec-iq-r-r00cpu/melsec-iq-r-r00cpu_user-manual_239139808.webp)
806
APPX
Appendix 4 List of Special Relay Areas
System information
The following is the list of special relay areas relating to the system information.
No.
Name
Data stored
Details
Set by (setting timing) CPU
SM203
STOP contact
Off: Other than STOP state
On: STOP state
This relay is on in STOP state.
S (Status change)
ALL
SM204
PAUSE contact
Off: Other than PAUSE
state
On: PAUSE state
This relay is on in PAUSE state. Note that
this relay is on during the END processing of
the scan which the specified PAUSE contact
turns on if PAUSE state is generated at the
PAUSE contact.
S (Status change)
ALL
SM210
Clock data set request
Off
On:setting request is
detected
On
Off:setting is completed
• Clock data stored in SD210 to SD216 is
written into the CPU module when this
relay is switched from off to on.
• This relay switches from on to off when
writing of clock data stored in SD210 to
SD216 into the clock element is
completed.
U/S (Status change)
ALL
SM211
Clock data set error
Off: No error
On: Error
This relay switches to on when an error is
generated in values from SD210 to SD216,
and to off when no error is generated.
S (Request)
ALL
SM213
Clock data read request
Off: Non-processing
On: Reading request
Clock data is loaded into SD210 to SD216
when this relay is in the ON state.
U
ALL
SM217
Daylight saving time status
flag
Off: Not during daylight
saving time
On: During daylight saving
time
Turns on if during daylight saving time with
daylight saving time function. Turns off if not
during daylight saving time.
S (Status change)
Rn
SM220
CPU No.1 preparation
completed
Off: Not completed
On: Completed
• This relay switches to on at the time when
access from the CPU module on other
CPUs to the CPU module for CPU No. n
is enabled during power-on or resetting.
• This relay is used as an interlock to
access the CPU module for the CPU No.
n when the multiple CPU synchronization
setting is configured to asynchronous
mode.
S (Status change)
ALL
SM221
CPU No.2 preparation
completed
ALL
SM222
CPU No.3 preparation
completed
ALL
SM223
CPU No.4 preparation
completed
ALL
SM230
No.1 CPU error flag
Off: CPU No.n normal
On: CPU No.n stop error
state
• This relay is off when the CPU module for
the CPU No.n is normal (including a
continuation error period).
• This relay is on when the CPU module for
the CPU No.n is in stop error state.
S (Status change)
ALL
SM231
No.2 CPU error flag
ALL
SM232
No.3 CPU error flag
ALL
SM233
No.4 CPU error flag
ALL
Содержание MELSEC iQ-R-R00CPU
Страница 2: ......
Страница 151: ...9 MONITOR FUNCTION 9 1 Real Time Monitor Function 149 9 MEMO ...
Страница 323: ...18 SEQUENCE SCAN SYNCHRONIZATION SAMPLING FUNCTION 321 18 MEMO ...
Страница 330: ...328 20 ROUTING SETTING 20 3 Precautions MEMO ...
Страница 423: ...26 BASIC CONCEPT 26 8 State Transition of the Redundant System 421 26 MEMO ...
Страница 524: ...522 30 MAINTENANCE AND INSPECTION FOR A REDUNDANT SYSTEM 30 1 Module Replacement in the Redundant System MEMO ...
Страница 1009: ...APPX Appendix 14 List of Available SQL Commands for CPU Module Database Access Function 1007 A MEMO ...
Страница 1014: ...1012 APPX Appendix 15 Added and Enhanced Functions MEMO ...
Страница 1027: ......