8-63
1. Leakage test on mechanical ventilation
Perform the leakage test in mechanical ventilation mode according to section 3.7.2
Leakage Test on Breathing System.
2. Leakage test on the breathing system in manual ventilation mode
Required tools:
Three breathing tubes
One Y-shape breathing tube
Test procedures:
(1) Enter the standby mode.
(2) Install the breathing circuit properly.
(3) Set Automatic/Manual switch to Manual.
(4) Set the pressure of the APL valve to the maximum.
(5) Block the interfaces on the patient end and the manual airbag arm using three corrugated
pipes and one corrugated pipe T-junction connector, as shown in the following figure.
(6) Enable the O2 flow regulator and set the O2 flow to 0.2 L/min.
(7) Enable the O2 flush and make the reading of the Paw pressure gauge rise to 30 cmH2O.
(8) Stop O2 inflation. If the reading of the Paw pressure gauge decreases below 30 cmH2O,
this test fails.
(9) If the reading of the Paw pressure gauge rapidly increases, disable the O2 flow regulator
in a timely manner to prevent the pressure from exceeding the measurement range of the
Paw pressure gauge. Otherwise, the damaged APL valve may damage the Paw pressure
gauge (in this test, if the O2 flow regulator is disabled due to this reason, the test is
considered as passed).
Содержание WATO EX-55Pro
Страница 1: ...WATO EX 55Pro 65Pro Anesthesia Machine Service Manual ...
Страница 2: ......
Страница 34: ...2 20 South African standard ...
Страница 48: ...2 34 VPM ...
Страница 139: ...4 39 b Gas Settings Press the Setup button select Setting ENTER Gas Settings MODIFY Gas Type O2 c Select BACK BACK BACK ...
Страница 142: ...4 42 ...
Страница 144: ...4 44 b Gas Settings Press the Setup button select Setting ENTER Gas Settings MODIFY Gas Type O2 c Select BACK BACK BACK ...
Страница 196: ...6 26 FOR YOUR NOTES ...
Страница 213: ...7 17 2 Zero the sensor without connecting any tubes 3 User Setup Gas Type O2 4 User Setup Measure Mode BTPS ...
Страница 288: ...8 34 Test fixture of the vaporizer support Anesthesia machine calibration device 1 MPa 10 bar test pressure gauge ...
Страница 356: ...8 102 FOR YOUR NOTES ...
Страница 396: ...9 40 2 Remove the two ends of the breathing tubes from the inspiration expiration connectors on the breathing system ...
Страница 438: ...9 82 FOR YOUR NOTES ...
Страница 440: ...10 2 10 3 Diagrams and Tables 24 17 16 7 6 5 3 2 18 20 25 1 4 23 21 22 15 14 13 12 11 10 9 8 26 19 ...
Страница 447: ...10 9 10 3 2 Hardware Box 2 4 3 5 7 8 6 12 9 10 13 14 15 1 11 ...
Страница 449: ...10 11 ...
Страница 455: ...10 17 10 3 5 WATO EX 55 Pro 65 Pro Cart Assembly ...
Страница 457: ...10 19 10 3 6 WATO EX 55 Pro 65 Pro Pre pak Circuit Bracket Assembly ...
Страница 462: ...10 24 4 3 1 2 ...
Страница 473: ......
Страница 474: ...PN 046 009688 00 4 0 ...