4-16
4.10.3 O2 Flush Test
4.10.3.1 In Mechanical Ventilation Mode
1. Connect the O2 pipeline supply or cylinder.
2. Set the bag/vent switch to the mechanical ventilation position.
3. Set the system to standby or working status.
4. Plug the patient connection using a test plug.
5. Turn off ACGO (if ACGO is configured).
6. Let the folding bag completely collapse.
7. Press and hold the O2 flush button
. Measure the time required for fully inflating
the folding bag.
8. Repeat the operation (opening patient connection to collapse the folding bag) at least
twice.
9. Check that the folding bag is fully inflated within 1 to 3 seconds.
4.10.3.2 In Manual Ventilation Mode
1. Set the bag/vent switch to the bag position.
2. Set the system to standby or working status.
3. Plug the patient connection using a test plug.
4. Connect a 3 L or 1 L bag to the bag arm or manual bag port.
5. Turn off ACGO (if ACGO is configured).
6. Let the bag completely collapse.
7. Turn the APL valve to 75 cmH2O.
8. Press and hold the O2 flush button
. Measure the time required for the reading on
the pressure gauge to reach 10 cmH2O.
9. Repeat the operation (open patient connection and press the bag to completely collapse
the bag) at least twice.
10. Check that
The 3 L bag is fully inflated within 3 to 6 seconds.
The 1 L bag is fully inflated within 1 to 3 seconds.
Reading of auxiliary O2
supply flowmwter
VT-PLUS
2 L/min
1.5~2.5 L/min
10 L/min
9~11 L/min
15 L/min
13.5~16.5 L/min
Содержание WATO EX-55Pro
Страница 1: ...WATO EX 55Pro 65Pro Anesthesia Machine Service Manual ...
Страница 2: ......
Страница 34: ...2 20 South African standard ...
Страница 48: ...2 34 VPM ...
Страница 139: ...4 39 b Gas Settings Press the Setup button select Setting ENTER Gas Settings MODIFY Gas Type O2 c Select BACK BACK BACK ...
Страница 142: ...4 42 ...
Страница 144: ...4 44 b Gas Settings Press the Setup button select Setting ENTER Gas Settings MODIFY Gas Type O2 c Select BACK BACK BACK ...
Страница 196: ...6 26 FOR YOUR NOTES ...
Страница 213: ...7 17 2 Zero the sensor without connecting any tubes 3 User Setup Gas Type O2 4 User Setup Measure Mode BTPS ...
Страница 288: ...8 34 Test fixture of the vaporizer support Anesthesia machine calibration device 1 MPa 10 bar test pressure gauge ...
Страница 356: ...8 102 FOR YOUR NOTES ...
Страница 396: ...9 40 2 Remove the two ends of the breathing tubes from the inspiration expiration connectors on the breathing system ...
Страница 438: ...9 82 FOR YOUR NOTES ...
Страница 440: ...10 2 10 3 Diagrams and Tables 24 17 16 7 6 5 3 2 18 20 25 1 4 23 21 22 15 14 13 12 11 10 9 8 26 19 ...
Страница 447: ...10 9 10 3 2 Hardware Box 2 4 3 5 7 8 6 12 9 10 13 14 15 1 11 ...
Страница 449: ...10 11 ...
Страница 455: ...10 17 10 3 5 WATO EX 55 Pro 65 Pro Cart Assembly ...
Страница 457: ...10 19 10 3 6 WATO EX 55 Pro 65 Pro Pre pak Circuit Bracket Assembly ...
Страница 462: ...10 24 4 3 1 2 ...
Страница 473: ......
Страница 474: ...PN 046 009688 00 4 0 ...