6-19
TV control and measurement are normal: the displayed TVe value should be within
the range of TV setting X (1±10%) ml.
Circuit leak is within the acceptable range: the folding bag can reach the top of the
bellows housing each time and the lowest graduation on the bellows housing which
the bag falls to each time corresponds to approximately TV setting.
Pressure measurement is normal: the Ppeak measured value is close to the peak
pressure reading on the airway pressure gauge. The error should not exceed 2
cmH2O.
No other ventilation failure occurs: the Paw and flow waveforms are displayed
normally and no technical alarms occur.
If the above test requirements are not met, perform subsequent checks and do the test again.
NOTE
If any errors are detected during VCV test, perform troubleshooting as per 5
Troubleshooting and do the test again until the system is normal.
6.6.1.2 Check Pressure Control Ventilation (PCV)
NOTE
PCV is one of the basic mechanical ventilation modes of the anesthesia machine.
PCV is configured depending on the user’s selection and machine type. If the
anesthesia machine under test is not configured with this mode, this test is not
required.
Checking pressure control ventilation is to check:
If the machine can provide pressure control ventilation normally, including pressure
control, feedback and measurement;
If the tidal volume and bellows scale measurements are normal;
The working status of the bellows assembly;
If the machine has obvious leaks;
If the fresh gas compensation is normal;
If the machine has ventilation failure alarm.
To check PCV:
1. Make sure that the supply pressure is normal and that the tubes in the breathing circuit
are correctly connected as required for mechanical ventilation. Connect a 2 L bag, which
is used as the test lung, to the Y piece in the patient circuit.
2. Set the bag/vent switch to the mechanical ventilation position.
Содержание WATO EX-55Pro
Страница 1: ...WATO EX 55Pro 65Pro Anesthesia Machine Service Manual ...
Страница 2: ......
Страница 34: ...2 20 South African standard ...
Страница 48: ...2 34 VPM ...
Страница 139: ...4 39 b Gas Settings Press the Setup button select Setting ENTER Gas Settings MODIFY Gas Type O2 c Select BACK BACK BACK ...
Страница 142: ...4 42 ...
Страница 144: ...4 44 b Gas Settings Press the Setup button select Setting ENTER Gas Settings MODIFY Gas Type O2 c Select BACK BACK BACK ...
Страница 196: ...6 26 FOR YOUR NOTES ...
Страница 213: ...7 17 2 Zero the sensor without connecting any tubes 3 User Setup Gas Type O2 4 User Setup Measure Mode BTPS ...
Страница 288: ...8 34 Test fixture of the vaporizer support Anesthesia machine calibration device 1 MPa 10 bar test pressure gauge ...
Страница 356: ...8 102 FOR YOUR NOTES ...
Страница 396: ...9 40 2 Remove the two ends of the breathing tubes from the inspiration expiration connectors on the breathing system ...
Страница 438: ...9 82 FOR YOUR NOTES ...
Страница 440: ...10 2 10 3 Diagrams and Tables 24 17 16 7 6 5 3 2 18 20 25 1 4 23 21 22 15 14 13 12 11 10 9 8 26 19 ...
Страница 447: ...10 9 10 3 2 Hardware Box 2 4 3 5 7 8 6 12 9 10 13 14 15 1 11 ...
Страница 449: ...10 11 ...
Страница 455: ...10 17 10 3 5 WATO EX 55 Pro 65 Pro Cart Assembly ...
Страница 457: ...10 19 10 3 6 WATO EX 55 Pro 65 Pro Pre pak Circuit Bracket Assembly ...
Страница 462: ...10 24 4 3 1 2 ...
Страница 473: ......
Страница 474: ...PN 046 009688 00 4 0 ...