4 - 1 8
Lucent Technologies
365-575-925R1.5
Issue 1, April 2002
To set up bridging on the OptiStar EdgeSwitch, complete the following steps:
Step 1
First, determine which GbE ports will support bridging. The ports that are going to do the bridging
should be assigned to the port group.
Example
: On OptiStar EdgeSwitch A, slots 2 & 3 contain Gigabit Ethernet Network modules. Let us
assume Module 2/Port 1, Module 2/Port 2 and Module 3/Port 1 are going to do the bridging. Therefore
these three ports should all be assigned to the same port group.
Step 2
Next, go to the current Port Mapping Table to find the port group number of the first Gigabit port to
be assigned to this bridging group. This will become the port group number for all the ports in this
bridging group.
Example:
Module 2/Port 1, Module 2/Port 2 and Module 3/Port 1 should be assigned to Port Group
3 (the default port group number for the first port in the group, which is Module 2/Port 1).
Step 3
To view the current port mapping, from the main menu follow the path:
[1] Operational Information & Status
→
→
→
→
[3] Port Mapping
The following table displays the default Port Mapping. Since there are eight possible switching ports,
the maximum number of port groups is also eight. The port numbers go from 1 to 8, and apply only
to the switching ports (
see Section 3.4.1, entitled “Slot Numbering”
, for a diagram showing how the
ports on the OptiStar EdgeSwitch are numbered).
Note that the console port and the management
port cannot be grouped.
Module Number
Port Number
Port Group
1
1
1
1
2
2
2
1
3
2
2
4
3
1
5
3
2
6
4
1
7
4
2
8
Step 4
Once you have checked the current Port Mapping, you are ready to set up bridging. To configure the
Port Mapping Table, from the main menu follow the path:
[3] Configuration
Æ
Æ
Æ
Æ
[5] Port Mapping
When this option is selected, the following prompts will be displayed in succession:
Enter Module Number (1-4) :
Enter the module number of the first port to be assigned to the new port group.
Enter Port Number (1-2) :
Enter the port number of the first port to be assigned to the new port group.
Enter Port Group (1-8)
:
Enter the number of the new port group.
Содержание OptiStar EdgeSwitch
Страница 4: ...THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 20: ...x v i Lucent Technologies 365 575 925R1 5 Issue 1 April 2002 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 26: ...x x i i Lucent Technologies 365 575 925R1 5 Issue 1 April 2002 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 27: ...Product Overview 365 575 925R1 5 Lucent Technologies 1 1 Issue 1 April 2002 CHAPTER 1 Product Overview...
Страница 62: ...3 1 2 Lucent Technologies 365 575 925R1 5 Issue 1 April 2002 THIS PAGE IS LEFT INTENTIONALLY BLANK...
Страница 178: ...5 6 4 Lucent Technologies 365 575 925R1 5 Issue 1 April 2002 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 274: ...7 1 0 Lucent Technologies 365 575 925R1 5 Issue 1 April 2002 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 275: ...Troubleshooting 365 575 925R1 5 Lucent Technologies 8 1 Issue 1 April 2002 CHAPTER 8 Troubleshooting...
Страница 281: ...Contacting Lucent 365 575 925R1 5 Lucent Technologies 9 1 Issue 1 April 2002 CHAPTER 9 Contacting Lucent...
Страница 283: ...Appendices 365 575 925R1 5 Lucent Technologies A P 1 Issue 1 April 2002 APPENDICES...
Страница 324: ......