6.1 Installation Preparations.................................................................................................................................................... 80
6.1.1 Site.......................................................................................................................................................................................... 80
6.1.1.1 Installation Environment............................................................................................................................................. 80
6.1.1.2 Installation Clearances (Three-Phase Four-Wire)............................................................................................... 81
6.1.1.3 Installation Clearances (Three-Phase Three-Wire).............................................................................................86
6.1.2 Tools and Instruments..................................................................................................................................................... 92
6.1.3 Preparing Power Cables.................................................................................................................................................. 94
6.1.4 Unpacking..........................................................................................................................................................................103
6.2 UPS Cable Connection Reference..................................................................................................................................104
6.3 Single UPS Installation (1200 kVA, Three-Phase Four-Wire).............................................................................. 105
6.3.1 Installation in Standard Configuration.................................................................................................................... 105
6.3.1.1 Installing Cabinets....................................................................................................................................................... 105
6.3.1.2 Installing Cables........................................................................................................................................................... 109
6.3.2 Installation in Top Cabling Configuration.............................................................................................................. 114
6.3.2.1 Installing Cabinets....................................................................................................................................................... 114
6.3.2.2 Installing Copper Bars and Cables......................................................................................................................... 114
6.3.3 Installation in Bottom Cabling Configuration....................................................................................................... 119
6.3.3.1 Installing Cabinets....................................................................................................................................................... 119
6.3.3.2 Installing Copper Bars and Cables......................................................................................................................... 124
6.3.4 Installation in Top Air-Flow Configuration............................................................................................................. 131
6.3.4.1 Installing Cabinets....................................................................................................................................................... 131
6.3.4.2 Installing Cables........................................................................................................................................................... 138
6.3.5 Installation in Top C Top Air-Flow Configuration................................................................................ 138
6.3.5.1 Installing Cabinets....................................................................................................................................................... 139
6.3.5.2 Installing Copper Bars and Cables......................................................................................................................... 139
6.4 Single UPS Installation (1200 kVA, Three-Phase Three-Wire)............................................................................140
6.4.1 Installation in Standard Configuration.................................................................................................................... 140
6.4.1.1 Installing Cabinets....................................................................................................................................................... 140
6.4.1.2 Installing Rectifiers in the Inductor Cabinet.......................................................................................................145
6.4.1.3 Installing Cables........................................................................................................................................................... 146
6.4.2 Installation in Top Cabling Configuration.............................................................................................................. 152
6.4.2.1 Installing Cabinets....................................................................................................................................................... 152
6.4.2.2 Installing Rectifiers in the Inductor Cabinet.......................................................................................................157
6.4.2.3 Installing Copper Bars and Cables......................................................................................................................... 158
6.4.3 Installation in Bottom Cabling Configuration....................................................................................................... 167
6.4.3.1 Installing Cabinets....................................................................................................................................................... 167
6.4.3.2 Installing Rectifiers in the Inductor Cabinet.......................................................................................................173
6.4.3.3 Installing Copper Bars and Cables......................................................................................................................... 174
6.4.4 Installation in Top Air-Flow Configuration............................................................................................................. 185
6.4.4.1 Installing Cabinets....................................................................................................................................................... 186
6.4.4.2 Installing Rectifiers in the Inductor Cabinet.......................................................................................................194
UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
Contents
Issue 05 (2021-10-13)
Copyright © Huawei Technologies Co., Ltd.
vi