Figure 6-352 Installing rectifiers and baffle plates
----End
6.6.3.3 Installing Copper Bars and Cables
Context
Figure 6-353 Copper bar positions
(1) Battery input
(2) Battery PE
(3) Mains input
(4) UPS output
(5) Bypass input
NO TE
The number and colors of cables in the figures are for reference only.
Procedure
Step 1 Remove the power distribution cover from the bypass cabinet.
UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
6 Installation
Issue 05 (2021-10-13)
Copyright © Huawei Technologies Co., Ltd.
285