6.4.4.3 Installing Cables........................................................................................................................................................... 195
6.4.5 Installation in Top C Top Air-Flow Configuration................................................................................ 196
6.4.5.1 Installing Cabinets....................................................................................................................................................... 196
6.4.5.2 Installing Rectifiers in the Inductor Cabinet.......................................................................................................196
6.4.5.3 Installing Copper Bars and Cables......................................................................................................................... 197
6.5 Single UPS Installation (1600 kVA, Three-Phase Four-Wire).............................................................................. 198
6.5.1 Installation in Standard Configuration.................................................................................................................... 198
6.5.1.1 Installing Cabinets....................................................................................................................................................... 198
6.5.1.2 Installing Cables........................................................................................................................................................... 204
6.5.2 Installation in Top Cabling Configuration.............................................................................................................. 209
6.5.2.1 Installing Cabinets....................................................................................................................................................... 209
6.5.2.2 Installing Copper Bars and Cables......................................................................................................................... 210
6.5.3 Installation in Bottom Cabling Configuration....................................................................................................... 216
6.5.3.1 Installing Cabinets....................................................................................................................................................... 216
6.5.3.2 Installing Copper Bars and Cables......................................................................................................................... 223
6.5.4 Installation in Top Air-Flow Configuration............................................................................................................. 232
6.5.4.1 Installing Cabinets....................................................................................................................................................... 232
6.5.4.2 Installing Cables........................................................................................................................................................... 241
6.5.5 Installation in Top C Top Air-Flow Configuration................................................................................ 241
6.5.5.1 Installing Cabinets....................................................................................................................................................... 241
6.5.5.2 Installing Copper Bars and Cables......................................................................................................................... 241
6.6 Single UPS Installation (1600 kVA, Three-Phase Three-Wire)............................................................................242
6.6.1 Installation in Standard Configuration.................................................................................................................... 242
6.6.1.1 Installing Cabinets....................................................................................................................................................... 243
6.6.1.2 Installing Rectifiers in the Inductor Cabinet.......................................................................................................250
6.6.1.3 Installing Cables........................................................................................................................................................... 251
6.6.2 Installation in Top Cabling Configuration.............................................................................................................. 258
6.6.2.1 Installing Cabinets....................................................................................................................................................... 258
6.6.2.2 Installing Rectifiers in the Inductor Cabinet.......................................................................................................265
6.6.2.3 Installing Copper Bars and Cables......................................................................................................................... 266
6.6.3 Installation in Bottom Cabling Configuration....................................................................................................... 276
6.6.3.1 Installing Cabinets....................................................................................................................................................... 276
6.6.3.2 Installing Rectifiers in the Inductor Cabinet.......................................................................................................284
6.6.3.3 Installing Copper Bars and Cables......................................................................................................................... 285
6.6.4 Installation in Top Air-Flow Configuration............................................................................................................. 298
6.6.4.1 Installing Cabinets....................................................................................................................................................... 298
6.6.4.2 Installing Rectifiers in the Inductor Cabinet.......................................................................................................310
6.6.4.3 Installing Cables........................................................................................................................................................... 311
6.6.5 Installation in Top C Top Air-Flow Configuration................................................................................ 312
6.6.5.1 Installing Cabinets....................................................................................................................................................... 312
6.6.5.2 Installing Rectifiers in the Inductor Cabinet.......................................................................................................312
6.6.5.3 Installing Copper Bars and Cables......................................................................................................................... 313
UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
Contents
Issue 05 (2021-10-13)
Copyright © Huawei Technologies Co., Ltd.
vii