Figure 6-211 Connecting a signal cable between the UPS and the SmartLi (only
for SmartLi 2.0)
(1) Monitoring interface unit in the master SmartLi cabinet
----End
6.5.2 Installation in Top Cabling Configuration
Cables can be routed from the top if the optional top cabling component is
configured.
6.5.2.1 Installing Cabinets
Install cabinets by referring to Single UPS Installation (1600 kVA, Three-Phase
Four-Wire) > Installation in Standard Configuration > Installing Cabinets.
UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
6 Installation
Issue 05 (2021-10-13)
Copyright © Huawei Technologies Co., Ltd.
209