Figure 6-357 Removing the covers, connecting kits, and battery copper bars
Step 4 Install epoxy boards (No. 11 to 14 and 16 to 20).
Figure 6-358 Installing epoxy boards
Step 5 Install battery copper bars (No. 65 and 67 to 69).
Figure 6-359 Installing battery copper bars
UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
6 Installation
Issue 05 (2021-10-13)
Copyright © Huawei Technologies Co., Ltd.
288