Figure 6-51 Installing power cables between the UPS and the SmartLi
(1) Connect the ground cable of the battery string or its BBB box to the battery PE of the UPS
or the ground bar in the equipment room based on the site survey.
Step 5 Install top frames (No. 14–17).
Figure 6-52 Installing top frames
Step 6 Install top covers.
UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
6 Installation
Issue 05 (2021-10-13)
Copyright © Huawei Technologies Co., Ltd.
117