Figure 6-67 Installing copper bars
Step 5 Remove the bottom cabling cover from the bottom cabling cabinet.
Step 6 Install equipotential ground cable for cabinets.
Figure 6-68 Installing equipotential ground cable for cabinets
UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
6 Installation
Issue 05 (2021-10-13)
Copyright © Huawei Technologies Co., Ltd.
126