Figure 6-252 Connecting a signal cable between the UPS and the SmartLi (only
for SmartLi 2.0)
(1) Monitoring interface unit in the master SmartLi cabinet
Step 15 Install the top frame.
Figure 6-253 Installing the top frame
Step 16 Install the front and rear mounting plates.
UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
6 Installation
Issue 05 (2021-10-13)
Copyright © Huawei Technologies Co., Ltd.
231