Figure 6-376 Hole dimensions (unit: mm)
(1) Top air-flow
cabinet
(2) Power cabinet 1
(3) Power cabinet 2 +
bypass cabinet
(3) Inductor cabinet
Step 2 Use a hammer drill to drill holes for installing expansion bolts and then install
expansion sleeves in the holes.
Step 3 Install the accessories of the top air-flow cabinet.
1. Remove the rear door panels of power cabinet 1, power cabinet 2, and the
bypass cabinet.
2. Secure the PC panels to the inner side of the rear door panel from the outer
side of the rear door using plastic rivets.
UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
6 Installation
Issue 05 (2021-10-13)
Copyright © Huawei Technologies Co., Ltd.
299