6.5.4.2 Installing Cables
Procedure
Step 1 Install cables by referring to Single UPS Installation (1600 kVA, Three-Phase
Four-Wire) > Installation in Standard Configuration > Installing Cables.
Step 2 Remove an accessory cover from the top of the top air-flow cabinet.
Step 3 Connect the power cable to the 380~480V System port on the UPS, connect the
signal cable of the top air-flow cabinet on the left to the PU XS2-1 in power
cabinet 1, and connect the signal cable of the top air-flow cabinet on the right to
the PU XS2-2 in power cabinet 2.
Figure 6-273 Power supply to the top air-flow cabinet
----End
6.5.5 Installation in Top C Top Air-Flow Configuration
●
If both the top cabling component and the top air-flow cabinet are
configured, cabinets can be installed against a wall and cables can be routed
from the top.
●
The following procedure applies to installation against a wall. If cabinets are
not installed against a wall and there is operation space at the rear of the
cabinets, you need to install the cabinet combination screws at the rear and
the anchor screws at the bottom.
6.5.5.1 Installing Cabinets
Install cabinets by referring to Single UPS Installation (1600 kVA, Three-Phase
Four-Wire) > Installation in Top Air-Flow Configuration > Installing Cabinets.
6.5.5.2 Installing Copper Bars and Cables
1. Install copper bars and cables by referring to Single UPS Installation (1600
kVA, Three-Phase Four-Wire) > Installation in Top Cabling Configuration
> Installing Copper Bars and Cables.