Figure 6-240 Installing signal cables inside the cabinets
Step 3 Remove the top covers from the bottom cabling cabinet, some connecting kits,
and battery copper bars.
Figure 6-241 Removing the covers, connecting kits, and battery copper bars
Step 4 Install epoxy boards (No. 11 to 14 and 16 to 20).
Figure 6-242 Installing epoxy boards
Step 5 Install battery copper bars (No. 65 and 67 to 69).
UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
6 Installation
Issue 05 (2021-10-13)
Copyright © Huawei Technologies Co., Ltd.
225