Figure 6-101 Installing rectifiers and baffle plates
----End
6.4.1.3 Installing Cables
Context
Figure 6-102 Copper bar positions
(1) Battery input
(2) Mains input
(3) Battery PE
(4) UPS output
(5) Bypass input
NO TE
The number and colors of cables in the figures are for reference only.
Procedure
Step 1 Install equipotential ground cable for cabinets.
UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
6 Installation
Issue 05 (2021-10-13)
Copyright © Huawei Technologies Co., Ltd.
146