4. Combine power cabinet 1 with other cabinets in the sequence of bottom, top,
and middle. (Remove the rear door of power cabinet 1 when installing the
cabinet combination screws in the middle at the rear of the cabinet.).
Figure 6-229 Combining cabinets
5. Reinstall the UPS rear door panels.
6. Remove the side panels from power cabinet 1 and the bypass cabinet.
7. Move the bottom cabling cabinet to the installation position.
8. Remove the front panel of the bottom cabling cabinet and combine the
bottom cabling cabinet.
UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
6 Installation
Issue 05 (2021-10-13)
Copyright © Huawei Technologies Co., Ltd.
219