Figure 6-42 Installing power cables between the UPS and the SmartLi
(1) Connect the ground cable of the battery string or its BBB box to the battery PE of the UPS
or the ground bar in the equipment room based on the site survey.
Step 4 Install top supports and covers of the battery terminal protective covers.
Figure 6-43 Installing top supports and covers
Step 5 Install input and output busbars.
UPS5000-H-(1200 kVA-1600 kVA)