6.5.2.2 Installing Copper Bars and Cables
Context
Figure 6-212 Copper bar positions
(1) Battery input
(2) Battery PE
(3) Mains input
(4) UPS output
(5) Bypass input
NO TE
The number and colors of cables in the following figures are for reference only.
Procedure
Step 1 Remove the power distribution cover from the bypass cabinet.
Figure 6-213 Removing the cover
Step 2 Install signal cables inside the cabinets.
UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)