6. Install baffle plates for the vacant slots.
Figure 6-189 Installing rectifiers and baffle plates
----End
6.4.5.3 Installing Copper Bars and Cables
1. Install copper bars and cables by referring to Single UPS Installation (1200
kVA, Three-Phase Three-Wire) > Installation in Top Cabling Configuration
> Installing Copper Bars and Cables.
2. Install fan power cables by referring to Single UPS Installation (1200 kVA,
Three-Phase Three-Wire) > Installation in Top Air-Flow Configuration >
Installing Cables.
3. Install the top frame for the top air-flow cabinet.
Figure 6-190 Installing a top frame
4. Install the mounting plates for the top air-flow cabinet.