Figure 6-31 Preparing a cable terminal outside the cabinet
NO TE
Choose an appropriate cabling route based on the actual situation. The figure is for
reference only.
Step 4 Connect the cable with a crimped terminal to the corresponding copper bar.
Step 5 Clear sundries inside the cabinet.
----End
6.3 Single UPS Installation (1200 kVA, Three-Phase
Four-Wire)
During installation and cable connection, do not step on the front door baffle
plate and the door support at the bottom of the cabinet to prevent paint flake-off
and deformation. Otherwise, the front door will not be properly closed. Do not
step on the top of the cabinet to prevent deformation or collapse.
6.3.1 Installation in Standard Configuration
6.3.1.1 Installing Cabinets
Installation on the Floor
NO TICE
Ensure that the installation floor is flat.
Step 1 Determine the cabinet installation positions on the floor based on the holes in the
marking-off template for floor installation.
UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
6 Installation