6.3.2 Installation in Top Cabling Configuration
Cables can be routed from the top if the optional top cabling component is
configured.
6.3.2.1 Installing Cabinets
Install cabinets by referring to Single UPS Installation (1200 kVA, Three-Phase
Four-Wire) > Installation in Standard Configuration > Installing Cabinets.
6.3.2.2 Installing Copper Bars and Cables
Context
Figure 6-45 Copper bar positions
(1) Battery input
(2) Mains input
(3) Battery PE
(4) UPS output
(5) Bypass input
NO TE
The number and colors of cables in the following figures are for reference only.
Procedure
Step 1 Install conversion copper bars from right to left and remove the left and right
connecting kits from the top of the cabinets.
Figure 6-46 Installing conversion copper bars
UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
6 Installation
Issue 05 (2021-10-13)
Copyright © Huawei Technologies Co., Ltd.
114