Figure 6-122 Installing rectifiers and baffle plates
----End
6.4.2.3 Installing Copper Bars and Cables
Context
Figure 6-123 Copper bar positions
(1) Battery input
(2) Mains input
(3) Battery PE
(4) UPS output
(5) Bypass input
NO TE
The number and colors of cables in the figures are for reference only.
Procedure
Step 1 Install conversion copper bars from right to left and remove the left and right
connecting kits from the top of the cabinets.
UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)