GE
D
IRECTION
FQ091019, R
EVISION
2
V
IVID Q
N S
ERVICE
M
ANUAL
Chapter 8 - Replacement Procedures
8-3
3.) Using both hands, pull the Bearing Handle slightly apart to release it from the system.
4.) Remove the Bearing Handle.
8-2-1-5
Bearing Handle Installation Procedure
1) Place a new Bearing Handle in position, using both hands to pull the Bearing Handle slightly apart
in order to slot the ends into the handle holes on the Vivid q N casing.
2.) Carefully fasten each captive screw on either side of the Bearing Handle to secure the handle in
position, by turning 1/4 turn in a
clockwise
direction.
NOTE:
When tightening the captive screws, do not use excessive force do not apply more than
1/4 turn; overtightening will damage the screw thread.
3.) Proceed to perform the
"Bearing Handle Test" on page 4-19
Figure 8-3 Bearing Handle Removed
Содержание FQ000040
Страница 2: ......
Страница 10: ...GE DIRECTION FQ091019 REVISION 2 VIVID Q N SERVICE MANUAL viii 3 SEP 2015 FRONTMATTER FM P R E L I M I N A R Y ...
Страница 11: ...GE DIRECTION FQ091019 REVISION 2 VIVID Q N SERVICE MANUAL ix 3 SEP 2015 FRONTMATTER FM P R E L I M I N A R Y ...
Страница 12: ...GE DIRECTION FQ091019 REVISION 2 VIVID Q N SERVICE MANUAL x 3 SEP 2015 FRONTMATTER FM P R E L I M I N A R Y ...
Страница 13: ...GE DIRECTION FQ091019 REVISION 2 VIVID Q N SERVICE MANUAL xi 3 SEP 2015 FRONTMATTER FM P R E L I M I N A R Y ...
Страница 14: ...GE DIRECTION FQ091019 REVISION 2 VIVID Q N SERVICE MANUAL xii 3 SEP 2015 FRONTMATTER FM P R E L I M I N A R Y ...
Страница 348: ...GE DIRECTION FQ091019 REVISION 2 VIVID Q N SERVICE MANUAL 6 4 Figure 6 6 Identifying Monitor Type ...
Страница 697: ......
Страница 698: ... 2013 and 2015 General Electric Company GE Vingmed Ultrasound AS P O Box 141 N 3191 HORTEN NORWAY www gehealthcare com ...