GE
D
IRECTION
FQ091019, R
EVISION
2
V
IVID Q
N S
ERVICE
M
ANUAL
8-96
Section 8-4 - SafeLock Cart Components Replacement
8-4-18-4
Front Wheel Installation Procedure
1) Place the new front wheel on the SafeLock Cart chassis in the same position as that of the
previously removed wheel.
2) Return and fasten the four bolts previously removed and make sure that wheel is secured firmly to
the chassis.
3) Stand the SafeLock Cart upright.
4.) Return the Vivid q N and all peripherals to their appropriate positions on the SafeLock Cart.
5.) Re-connect the AC adapter and all cables and peripherals to the Vivid q N portable ultrasound
scanner.
6.) Re-connect mains power to the AC adapter.
7) Proceed to perform the following functionality tests:
-
"SafeLock Cart - Grounding Continuity" on page 10-22
-
"SafeLock Cart - Chassis Current Leakage Test" on page 10-24
Содержание FQ000040
Страница 2: ......
Страница 10: ...GE DIRECTION FQ091019 REVISION 2 VIVID Q N SERVICE MANUAL viii 3 SEP 2015 FRONTMATTER FM P R E L I M I N A R Y ...
Страница 11: ...GE DIRECTION FQ091019 REVISION 2 VIVID Q N SERVICE MANUAL ix 3 SEP 2015 FRONTMATTER FM P R E L I M I N A R Y ...
Страница 12: ...GE DIRECTION FQ091019 REVISION 2 VIVID Q N SERVICE MANUAL x 3 SEP 2015 FRONTMATTER FM P R E L I M I N A R Y ...
Страница 13: ...GE DIRECTION FQ091019 REVISION 2 VIVID Q N SERVICE MANUAL xi 3 SEP 2015 FRONTMATTER FM P R E L I M I N A R Y ...
Страница 14: ...GE DIRECTION FQ091019 REVISION 2 VIVID Q N SERVICE MANUAL xii 3 SEP 2015 FRONTMATTER FM P R E L I M I N A R Y ...
Страница 348: ...GE DIRECTION FQ091019 REVISION 2 VIVID Q N SERVICE MANUAL 6 4 Figure 6 6 Identifying Monitor Type ...
Страница 697: ......
Страница 698: ... 2013 and 2015 General Electric Company GE Vingmed Ultrasound AS P O Box 141 N 3191 HORTEN NORWAY www gehealthcare com ...