GE
D
IRECTION
FQ091019, R
EVISION
2
V
IVID Q
N S
ERVICE
M
ANUAL
Chapter 8 - Replacement Procedures
8-77
8-4-8-4
Peripheral Power Cable Installation Procedure
Correct routing of the Peripheral AC Outlet cable is shown in
, below.
NOTE:
Before starting the routing procedure adhere two plastic cable holders to the metal linear guide
bracket as shown in
(middle picture).
1.) Insert the replacement Peripheral Power cable and power socket in position in the SafeLock’s
Upper Cover (front) (see item 4 in
2.) With the AC power socket plugged into the cart (
, left picture), connect the ground cable
to the body of the cart.
3.) Route the Peripheral AC Outlet cable as shown in the middle picture of
.
4.) Secure the cable with the cable clamp in the direction shown in
5.) Route the cable and the ground cable over the plastic cable holders (
middle picture)
and secure the cables with the tie-wraps.
Figure 8-90 Routing of Peripheral AC Outlet Cable from Left to Right
Figure 8-91 Correct Installation of Cable Clamp
Содержание FQ000040
Страница 2: ......
Страница 10: ...GE DIRECTION FQ091019 REVISION 2 VIVID Q N SERVICE MANUAL viii 3 SEP 2015 FRONTMATTER FM P R E L I M I N A R Y ...
Страница 11: ...GE DIRECTION FQ091019 REVISION 2 VIVID Q N SERVICE MANUAL ix 3 SEP 2015 FRONTMATTER FM P R E L I M I N A R Y ...
Страница 12: ...GE DIRECTION FQ091019 REVISION 2 VIVID Q N SERVICE MANUAL x 3 SEP 2015 FRONTMATTER FM P R E L I M I N A R Y ...
Страница 13: ...GE DIRECTION FQ091019 REVISION 2 VIVID Q N SERVICE MANUAL xi 3 SEP 2015 FRONTMATTER FM P R E L I M I N A R Y ...
Страница 14: ...GE DIRECTION FQ091019 REVISION 2 VIVID Q N SERVICE MANUAL xii 3 SEP 2015 FRONTMATTER FM P R E L I M I N A R Y ...
Страница 348: ...GE DIRECTION FQ091019 REVISION 2 VIVID Q N SERVICE MANUAL 6 4 Figure 6 6 Identifying Monitor Type ...
Страница 697: ......
Страница 698: ... 2013 and 2015 General Electric Company GE Vingmed Ultrasound AS P O Box 141 N 3191 HORTEN NORWAY www gehealthcare com ...