Operating Manual
PRIMING AND RINSING
Software-Version 2.6
B|BRAUN
Chapter 4
Page 4 of 19
SHARING EXPERTISE
2.6_CA-EN_03
When <
Parameter Overview
> is selected in the menu
bar, the screen display changes to Parameter
Overview.
By selecting the <
Flow Scheme
> menu item in the
menu bar, the display changes to the Flow Scheme.
When in the <
Flow Scheme
> screen and the
<
Parameter Setting
> menu item is selected in the
menu bar, the screen changes to the Parameter
Overview.
Final System Check
Ensure that all connections between the line
system and the filters have been made.
Tighten all screw locks as well as the Hansen
connectors again.
Make sure that the lines are not kinked.
Make sure that the electrolyte solution is mixed
with the bicarbonate solution and the sealing
seam is completely open.
Make sure that the break seals of the saline bags
on the IV-pole and the load cell are open.
Make sure that the break seals of the dialysis
fluid bags are open.
Ensure that the clamps at the unused ports of
the empty bags are closed.