8-1
E
HULL
HOOD
HANDLEBAR
HANDLEBAR
EXPLODED DIAGRAM
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
Q’ty
Service points
HANDLEBAR COVER REMOVAL
Follow the left “Step” for removal.
1
Screw
4
2
Handlebar cover
1
3
Pad
1
4
Bolt
2
NOTE:
Position the corrugated tube for the throttle
cable as shown in the illustration so that the
tube attaches to the end of the outer throttle
cable.
5
Handlebar cover stay
1
6
Throttle cable
1
7
Bolt
4
8
Upper handlebar holder
2
Reverse the removal steps for installation.