5-108
E
POWR
PRESSURE CONTROL VALVE
PRESSURE CONTROL VALVE
EXPLODED DIAGRAM
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
Q’ty
Service points
PRESSURE CONTROL VALVE
REMOVAL
Follow the left “Step” for removal.
Exhaust manifold
Refer to “EXHAUST MANIFOLD”.
1
Clamp/cooling water hose
1/1
È
From exhaust manifold
2
Clamp/cooling water hose
2/2
É
To exhaust pipe
3
Clamp/cooling water hose
2/1
4
Clamp/cooling water hose
2/1
5
Joint
1
6
Clamp/cooling water hose
1/1
Ê
To oil tank
7
Joint
1
Ë
From cooling water inlet
8
Clamp/cooling water hose
2/1
Ì
To oil tank
9
1
8
10
11
8
6
7
4
4
5
3
3
2
2
LT
572
LT
572
6
×
45 mm
2nd 7.6 N • m (0.76 kgf • m, 5.5 ft • Ib)
1st 3.7 N • m (0.37 kgf • m, 2.7 ft • Ib)
È
È
È
È
É
É
Ê
Ë
Ì