5-18
E
POWR
OIL TANK
EXPLODED DIAGRAM
Step
Procedure/Part name
Q’ty
Service points
23
Nut
2
24
Oil tank
1
25
Pin
2
26
O-ring
4
27
Connector
2
28
Bolt
2
29
Oil tank stay
1
Reverse the removal steps for installation.
LT
572
LT
572
LT
572
LT
572
LT
572
LT
572
LT
572
LT
572
LT
572
LT
572
LT
572
LT
572
29
28
26
25
27
26
22
20
17
18
19
1615
21
12
23
24
5
3
4
11
1
13
10
6
8
9
5
7
2
E
6
A
A
6
×
35 mm
2nd 7.6 N • m (0.76 kgf • m, 5.5 ft • Ib)
1st 3.7 N • m (0.37 kgf • m, 2.7 ft • Ib)
6
×
30 mm
2nd 7.6 N • m (0.76 kgf • m, 5.5 ft • Ib)
1st 3.7 N • m (0.37 kgf • m, 2.7 ft • Ib)
2nd 15 N • m (1.5 kgf • m, 11 ft • Ib)
1st 2.0 N • m (0.2 kgf • m, 1.4 ft • Ib)
3rd 39 N • m (3.9 kgf • m, 28 ft • Ib)
2nd 28 N • m (2.8 kgf • m, 20 ft • Ib)
1st 15 N • m (1.5 kgf • m, 11 ft • Ib)
8
×
80 mm
2nd 15 N • m (1.5 kgf • m, 11 ft • Ib)
1st 2.0 N • m (0.2 kgf • m, 1.4 ft • Ib)
10
×
70 mm
3rd 39 N • m (3.9 kgf • m, 28 ft • Ib)
7.6 N • m (0.76 kgf • m, 5.5 ft • Ib)
6
×
16 mm
7.6 N • m (0.76 kgf • m, 5.5 ft • Ib)
6
×
20 mm
7.6 N • m (0.76 kgf • m, 5.5 ft • Ib)
6
×
12 mm
È
Ë
Í
É
Ê
Ì
14
b
a
4
Not reusable