6.
To agree, click the
‘Confirm’
button (Fig. 162).
Fig. 163: Flap position confirmed
7.
If you have verified the parameter setting, press the
‘Start’
button
(Fig. 163). When the green highlighted frame appears in the ‘Treatment’
screen, finally press the ‘Procedure’ footswitch. Remember to keep the
footswitch pressed during the whole procedure.
The
‘Procedure’
footswitch must be pressed from the start of the procedure
until the end of the procedure! If you release the
‘Procedure’
footswitch, the
treatment will pause. Press the footswitch again to continue the treatment.
ð
An acoustic signal is emitted during the procedure.
The progress is displayed in the
‘Flap’
progress bar (Fig. 164).
L
WARNING! Rough beds or tissue bridges can occur due to cor‐
recting vertical shear force movement!
Vertical force may slowly decrease, or the executed shear force
may change while the procedure is being performed. If this
decrease or the change is corrected, it can affect the alignment or
the result of the treatment and cause severe patient injuries.
– You must not correct slowly decreasing vertical force or
changing shear force.
TREATMENT
9
SKU: 70005780TPV * Version 6 * UM-100010770 GB
9 - 53
TPV Controlled Document / Status: Effective / Effective Date: Jun 14, 2017 2:38:46 PM
UM-100010770 / Version 6 / Page 179 of 207
Summary of Contents for Victus
Page 12: ...GENERAL INFORMATION A SKU 70005780TPV Version 6 UM 100010770 GB A 4 ...
Page 16: ...INTRODUCTION 1 SKU 70005780TPV Version 6 UM 100010770 GB 1 4 ...
Page 48: ...CLINICAL APPLICATIONS 5 SKU 70005780TPV Version 6 UM 100010770 GB 5 6 ...
Page 186: ...TREATMENT 9 SKU 70005780TPV Version 6 UM 100010770 GB 9 60 ...
Page 201: ...Appendix 13 SKU 70005780TPV Version 6 UM 100010770 GB 13 1 ...