BIOSTRENGTH LINE: Service & Maintenance manual - rev. 2.1
Page 7.355
7.9.9. D
ISASSEMBLING THE WEIGHT STACK PULLEYS
Figure 7.9.9-1
Follow the steps described in paragraph 7.9.8.
“Disassembling the plexiglas weight stack
guard”.
For each of the 2 CENTRAL PULLEYS :
1. Unscrew the screw
a
using an 8-gauge
hexagonal T-wrench.
2. Remove the PULLEY.
For each of the 2 SIDE PULLEYS:
3. Unscrew the screw
b
and its nut using 2 17-
gauge wrenches.
4. Remove the PULLEY.
To reassemble the PULLEYS, follow the above
steps in reverse order.
For easier disassembly and reassembly
of the PULLEYS, it may be necessary to
loosen the cable tension.
When the operation is complete, adjust
the cable tension as described in
paragraph 8.4. .
Summary of Contents for BIOSTRENGTH LINE
Page 1: ...SERVICE MAINTENANCE MANUAL REV 2 1...
Page 2: ......
Page 4: ......
Page 16: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page xii Page intentionally left blank...
Page 88: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 2 70 Page intentionally left blank...
Page 99: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 3 11 Figure 3 2 5...
Page 122: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 4 2 Page intentionally left blank...
Page 634: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 9 26 Page intentionally left blank...
Page 645: ......