![Technogym BIOSTRENGTH LINE Service Maintenance Manual Download Page 508](http://html1.mh-extra.com/html/technogym/biostrength-line/biostrength-line_service-maintenance-manual_1070169508.webp)
BIOSTRENGTH LINE: Service & Maintenance manual - rev. 2.1
Page 7.334
7.8.31. D
ISASSEMBLING THE DOUBLING CABLE
Figure 7.8.31-1
Follow the steps described in paragraph 7.8.18.
“Disassembling the upright guard”.
1. Unscrew the 2 dowels
a
, using a 4-gauge
hexagonal T-wrench.
2. Remove the DOUBLING CABLE with the
aid of a pair of pliers.
3. Unscrew the screw
b
, and the nut
c
using 2
22-gauge wrenches.
4. Remove the DOUBLING CABLE by sliding
it out of the pulleys.
To disassemble the joint:
1. Unscrew the screw
d
using a 17-gauge
wrench.
2. Remove the joint.
To reassemble the DOUBLING CABLE, follow
the above steps in reverse order.
When the operation is complete, adjust
the DOUBLING CABLE tension as
described in paragraph 8.7. .
Summary of Contents for BIOSTRENGTH LINE
Page 1: ...SERVICE MAINTENANCE MANUAL REV 2 1...
Page 2: ......
Page 4: ......
Page 16: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page xii Page intentionally left blank...
Page 88: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 2 70 Page intentionally left blank...
Page 99: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 3 11 Figure 3 2 5...
Page 122: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 4 2 Page intentionally left blank...
Page 634: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 9 26 Page intentionally left blank...
Page 645: ......