BIOSTRENGTH LINE: Service & Maintenance manual - rev. 2.1
Page 7.121
1. Remove the bearing
e
.
2. Use a 3-gauge hexagonal T-wrench to
unscrew the 6 screws
l
.
3. Remove the pinion.
To replace the SECONDARY SHAFT and its
components, follow the above steps in reverse
order.
To reassemble the components of the
SECONDARY SHAFT, align the punch
on a tooth of the pinion with the hole in
the cam.
When the operation is complete, adjust
the alignment and tension of the
PRIMARY SHAFT-SECONDARY
SHAFT CHAIN as described in
paragraphs 8.11. and 8.12. .
Summary of Contents for BIOSTRENGTH LINE
Page 1: ...SERVICE MAINTENANCE MANUAL REV 2 1...
Page 2: ......
Page 4: ......
Page 16: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page xii Page intentionally left blank...
Page 88: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 2 70 Page intentionally left blank...
Page 99: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 3 11 Figure 3 2 5...
Page 122: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 4 2 Page intentionally left blank...
Page 634: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 9 26 Page intentionally left blank...
Page 645: ......