![Technogym BIOSTRENGTH LINE Service Maintenance Manual Download Page 564](http://html1.mh-extra.com/html/technogym/biostrength-line/biostrength-line_service-maintenance-manual_1070169564.webp)
BIOSTRENGTH LINE: Service & Maintenance manual - rev. 2.1
Page 7.390
7.9.40. D
ISASSEMBLING THE LEVER MAT RUBBER
Figure 7.9.40-1
1. Shut off the equipment and unplug the power
cord from the wall socket.
For each LEVER MAT:
2. Unscrew the 5 screws
a
using a 3-gauge
hexagonal T-wrench.
3. Remove the RUBBER.
To reassemble the LEVER MAT RUBBER,
follow the above steps in reverse order.
Summary of Contents for BIOSTRENGTH LINE
Page 1: ...SERVICE MAINTENANCE MANUAL REV 2 1...
Page 2: ......
Page 4: ......
Page 16: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page xii Page intentionally left blank...
Page 88: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 2 70 Page intentionally left blank...
Page 99: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 3 11 Figure 3 2 5...
Page 122: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 4 2 Page intentionally left blank...
Page 634: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 9 26 Page intentionally left blank...
Page 645: ......